George Baxters Fish Processing Plant




 Autumn of 2017 C & M Environmental completed the work in a medium sized efficient fish processing factory. George Baxters' in Bathgate, Scotland. 

The industrial unit development was a commercial  Refrigeration Project which required  us to provide refrigeration cooling plant to maintain dedicated room temperatures to various room compartments. The Preparation area was designed and set to operate at 10 degC. with Despatch and Intake chilled areas designed to operate at -1 degree C and the Freezer rooms  at -18 degrees C. A Ziegra 2.5 tonn ice machine was set above the Despatch chill to provide flaked ice to fill the dolabs below.



The project was a New-Build, and we were involved for just over eight weeks and involved 4 of our trained Refrigeration Engineers.



As it was a New-Build, we were involved at all points of the process from concept design to actual operational performance. We delivered the project as promised and the client was delighted with the result. Our engineers installed refrigeration units utilising Copeland High-Efficiency Scroll Technology compressors and Evaporators with EC rated fans to improve the overall performance and efficiency.

We deliver projects in a variety of sectors and the food processing industry is one that we thrive in.

Contact one of our Refrigeration and Air Conditioning experts today.


Refcom Refcom Elite Construction Online BESA URS ISO 9001 Select Masternaut C02 URS ISO 14001
All Content © C&M Environmental 1972 - 2025 | Website Terms of Use | Powered by Couch CMS | digital marketing glasgow / gaapdigital.co.uk
C&M Environmental, (Registration Number SC051965). Registered Office at 52 Strathmore Road Balmore Industrial Estate Glasgow, G22 7DW. VAT Number 261 6514 69